Kundan Green Energy Commissions Luni HEP, 7th Plant In Himachal

Kundan Green Energy commissioned its hydropower plant at Luni in Himachal Pradesh. Created at a cost of approximately Rs. 75 crore, the project was awarded in September of 2022 and once again demonstrates Kundan Green Energy’s consistent record of executing hydropower projects on record best-in-class standards, committed time-frames and optimal results. The Luni hydropower plant will bring operating hydropower capacities of Kundan Green Energy to 85 MWs and growing. Adding the existing solar and wind based installed generation projects, the total commissioned and functioning projects of Kundan Green Energy as on date stand at a capacity of 120.5 MWs.

Kundan Green Energy and its subsidiaries have four operational hydro power plants in Sikkim and three more are under construction, with larger capacities.

“With its commissioning in a record 24 months, we are delighted to present the Luni HEP project to the country. It once again demonstrates our practiced commitment to speed, quality, technology and teamwork benchmarked to the world’s best. Emblematic of the best suited source of green energy, hydropower has very vast untapped potential, which we are working to develop as we contribute to the country’s energy transition.” Said Mr. Udit Garg, Director &CEO, Kundan Green Energy.

Leave a Reply

Your email address will not be published. Required fields are marked *

Climate Change – Our Planet’s Greatest Challenge How ESG Data and Analytics are Revolutionizing Sustainable Finance in 2024